Building Smarter Together: The Power of Parallel Estimating
One of the most common friction points in any construction project is cost. Numbers shift. Assumptions vary. Owners are often left stuck between design ambition and financial reality. The solution isn’t just to estimate earlier—it’s to estimate in parallel.
Parallel estimating is about unifying two perspectives—yours and your contractor’s—early in the process so you’re not pricing things twice or designing in a vacuum. It keeps everyone aligned while there’s still time (and budget) to adapt.
What Is Parallel Estimating?
Parallel estimating involves developing independent, side-by-side cost estimates by both the owner’s team and the contractor during design. These estimates are based on the same set of drawings and specifications—but generated separately.
Rather than relying on a single source of truth, parallel estimating brings two expert views to the table, helping highlight discrepancies, assumptions, and opportunities.
Why It Works
Construction is full of variables—and assumptions. Different stakeholders may interpret drawings, scope, or material choices in different ways. Parallel estimating surfaces those differences early, while it’s still easy to pivot.
The outcome: fewer surprises, better design-to-budget alignment, and greater trust across teams.
What Gets Uncovered
When both the owner’s representative (or cost consultant) and the contractor generate estimates from the same design set, you quickly see:
- Scope misalignments
- Differing unit costs or subcontractor assumptions
- Gaps in allowances or exclusions
- Material specification differences
- Labor rate variances
These aren’t just accounting issues—they’re decision-making moments.
Benefits for Owners
When used strategically, parallel estimating gives owners a major advantage:
- Clarity: Understand cost drivers and where estimates diverge
- Control: Make informed choices before designs are locked in
- Confidence: Reduce risk of major budget swings during buyout
- Collaboration: Encourage open, data-backed dialogue with the design-build team
It shifts the focus from “Who’s right?” to “What’s best for the project?”
When to Use It
Parallel estimating is especially useful in:
- Design-build projects where multiple disciplines overlap
- High-budget custom homes or developments with unique materials or systems
- Public-private partnerships or institutional projects with strict cost compliance
- Fast-track or phased projects where early packages must be priced quickly and confidently
Even for single-family custom builds, it’s a powerful tool for making sure the design team and builder are pricing the same vision.
How Westgate Leads the Process
At Westgate, we initiate parallel estimating as a strategic tool—not a conflict-resolution tactic. We partner with your architect, builder, and independent estimators to ensure that every line item is clearly scoped, and every dollar has intention behind it.
We don’t just hand you numbers. We walk you through the logic behind them—where they align, where they don’t, and what that means for your build. Because smart construction starts with shared understanding.
Align Early. Build Confidently.
Parallel estimating isn’t just about cost control—it’s about decision clarity. When owners, architects, and builders align early on scope and cost, the rest of the project flows smoother, faster, and with fewer surprises.
About Westgate
At Westgate, our team of construction professionals, distinguished by Canada's prestigious Gold Seal certification - the highest national benchmark for construction management excellence - brings together the best of two nations.
Contact Us
Let’s successfully turn your vision into reality.
Our Services
Pre-Construction
Project Controls
Design-Build Services
General Contracting
Construction Management
Service Division
Stay up to date with westgate